Mission-readyInfrastructure.Delivered fast.
We source. We integrate. We deploy.
Power, accommodation, water, sanitation and climate – integrated into one operational site, from sourcing to commissioning.


One point of contact
One requirement.One partner.One operational site.
Tell us what your site needs to deliver. RIE coordinates the right systems, suppliers and technical trades through one aligned concept and schedule. From individual infrastructure components to a complete site, you have one central point of contact.
One requirement. One delivery schedule. One point of responsibility.
When your site needs to be ready sooner. For temporary workspace and accommodation, additional supply capacity and operations before permanent infrastructure is complete.
- Temporary sites
- Operational expansions
- Interim supply
Infrastructure
Integrated infrastructure
RIE is an integrator and deployment partner, not a manufacturer of individual components. All six areas are sourced, planned and deployed as one coordinated solution.

power
Power supply
Generators, storage and distribution for site operations.
Generators · Battery storage · Hybrid systems · Distribution · Transformers · Cabling · Site lighting
View solution
shelter
Accommodation and workspace
Modular spaces for accommodation, work and daily operations.
Accommodation · Offices · Operations rooms · Kitchens · Dining · Medical · Storage · Workshop solutions
View solution
sanitation
Sanitation and hygiene
WC, showers and wastewater systems matched to use and headcount.
WC · Shower · Laundry · Wastewater · Tanks · Pumping solutions
View solution
water
Water supply
Storage, treatment and distribution matched to on-site demand.
Storage · Treatment · Filtration · Pumping · Distribution
View solution
climate
Heating, cooling and ventilation
Temporary heating, cooling and ventilation for rooms and technical areas.
Heating · Cooling · Ventilation · Mobile boilers · Chillers · HVAC
View solution
deployment
Logistics and commissioning
Transport, installation and technical coordination through to operational readiness.
Transport · Heavy logistics · Crane operations · Installation · Electrical works · Plumbing · Commissioning · Maintenance · Demobilisation
View solution
RIE 48
From requirement to feasibilityin 48 hours.
RIE 48 is the fast lane into a project: you send four key details, and within 48 hours you receive an initial substantiated feasibility assessment.
Your key details
- 01Location
- 02Headcount
- 03Required operational date
- 04Infrastructure needed
Our initial assessment
- Feasibility
- Initial site concept
- Indicative budget
- Expected delivery schedule
RIE 48 means an initial substantiated feasibility assessment. Delivery and commissioning follow a project-specific schedule and confirmed availability.
Supply network
European engineering.At scale.
We are building a European supply network for modular infrastructure.
For each requirement, we assess technical suitability, availability and deployment options with appropriate providers. Suppliers, logistics and technical trades are coordinated for each project.
- 01Availability
- 02Technical suitability
- 03Coordinated deployment

Industries
Where requirements arise.
01Industry & Manufacturing
For construction phases, plant shutdowns and expansions.
02Critical Infrastructure
Interim supply during maintenance and modernisation.
03Defence Industry
Site supply for production and project teams.
04Emergency & Special Requirements
When supply capacity has to be added at short notice.
How RIE works
- 01
You describe the requirement.
Location, headcount, operational date and the infrastructure needed.
- 02
We assess feasibility.
We clarify available systems, capacities and the key site conditions.
- 03
We plan and coordinate.
After your decision we detail the concept, budget, suppliers and schedule.
- 04
We coordinate the deployment.
Transport, installation and commissioning are carried out with the specialist partners involved.
From requirement to operation.
About RIE
We source. We integrate. We deploy.
Our approach connects sourcing, technical coordination and deployment. We coordinate the interfaces between systems, suppliers and technical trades to turn individual components into a usable operational site.
The focus is not individual components. The focus is making the site operational.
About RIERIE 48
From requirement to feasibility in 48 hours.